Further, the land plans are prepared by superimposing the additional land requirement on the Village revenue maps independently, for the 6 locations (Covering(covering 9 villages), including 3 VUP, 2 Flyover junctions, and Toll plaza area and, enclosed together with schedules.
The text above was approved for publishing by the original author.
Previous
     
Next
Simplemente dirígete a tu casilla, presiona en el enlace de confirmación que te hemos enviado y recibirás el texto corregido. Si quieres corregir más correos electrónicos, puedes simplemente:
Ó