CWC management currently uses thea job order costing system because each product, standard windows or custom windows, requires unique designsdesign. CostThe cost of products is determined by actual direct costs and overhead using a predetermined rate to the actual volume of the allocation base (normal costing). CWC allocates their overhead costs using the facility-wide rate, based on machine hours. Total costs for each product are accumulated using the job cost sheet. The product costs for each product fully absorb the manufacturing costs (absorption costing).
The text above was approved for publishing by the original author.
Previous
     
Next
Simplemente dirígete a tu casilla, presiona en el enlace de confirmación que te hemos enviado y recibirás el texto corregido. Si quieres corregir más correos electrónicos, puedes simplemente:
Ó