Nick,
Please see attachments for to help visualvisualize the issue we are having.
In the PPOP room, unit PPBB-01 and in the SPOP room, unit PPBB-02 are hitting the cable tray.
With the units on the stand and set 10”, the cable tray is hitting the front of Crac Unit 1 ½” in, from the top of the Crac.
For proper air flow, the Crac stand is neededneeds to sit at 12”.
Also once the return plenum is installed, the upper racks on the cable tray will need some alterations as well.
Can that section of the cable be notched out?
Please advise as soon as possible, as this will definitely effect us hitting the 5/10 date.